Skip to main content
  • On-demand Webinar

Austrian TOR Requirements for EV Chargers V1G & V2G

Learn about Austrian TOR requirements and testing methods for EV chargers, including compliance with OVE R 37 and grid connection rules for V1G and V2G applications.

An EV charging at a charging station with wind turbines in the background

Austria has introduced specific grid code requirements for electric vehicle (EV) chargers to support their safe and reliable integration into the electrical network. These requirements are defined under the Technical and Organisational Rules for Network Operators and Users (TOR) and complemented by the OVE-Richtlinie R 37, which establishes methods for compliance testing.

Watch this on-demand webinar to learn about the Austrian regulatory framework for EV chargers, including V1G and V2G applications. Our experts covered the key requirements, conformity evaluation methods and testing considerations manufacturers should understand when demonstrating compliance and pursuing market access.

Agenda

  • Austrian grid code requirements for EV chargers
  • TOR framework and grid connection rules
  • Conformity evaluation method (OVE R 37)
  • Overview of testing requirements and methods
  • Q&A

Who should watch

  • EV charger manufacturers
  • Product managers and R&D teams
  • Compliance and certification engineers

To access the rest of this engaging content, please fill out the form below:

Please wait…