UL Worldwide
North America
Europe
Denmark
France
Germany
Sweden
Switzerland
U.K.
Latin America
Asia Pacific
Argentina
Brazil
Mexico
Australia
India
Malaysia
New Zealand
Thailand
Hong Kong
Singapore
Learn more about the Product Mindset — a global collective consciousness reflecting how people feel about products — whether they are making and selling them or buying and consuming them.
more
UL Advantage is a revolutionary approach to safety certification, providing a faster, smarter, more flexible path to the proven benefits of UL certification.
more
Helping safe, compliant products to reach the global marketplace.
more
Delivering a breadth of services for the growing area of sustainability.
more
Leveraging UL's engineering, safety and performance expertise for the critical systems essential to our well-being.
more
Delivering product testing and assessments demanded by the global supply chain.
more
Offering training, advisory services and thought leadership to give businesses a competitive edge.
more
Share

Sample and information requirements

Applications to initiate an investigation will be furnished once the following information has been received. Assistance to guide you through the process of assembling the information package can be provided upon request. Not all of the following may be applicable depending on the nature of the product being submitted.

Components

A complete description of all components, sub-assemblies and materials used in and on the product including model numbers with which the component is used, the component model number, ratings, and existence of any third party certifications.

Exhaust system

One complete exhaust system diagram for each unit.

Fault analysis

A copy of the FMEA or HAZOPS developed for each product in accordance with the safety standard.

Fuel or fluid handling system

One complete fuel or fluid handling system diagram for each unit. List all fuel or fluid system components including the manufacturer's name, model or part number, electrical and mechanical ratings of each component, and if it is UL Listed or Recognized.

Gasket materials

Identification of non-metallic gasket and seal materials by manufacturer's name, compound designation, and generic name of material. Indication of any third party certifications and the gas or liquid it will be in contact with.

Manufacturer's data

Manufacturer's and third party certification organization's data including test methods, schematic diagrams of the test circuits, and description of the test instruments.

Markings

Drawings of all markings that appear on the product including nameplate and safety markings.

Optional and alternate constructions

A list detailing any variations from the basic construction including product sizes and alternate parts sources.

Photographs

Overall view, electrical enclosures, gas enclosures, open units, breaker box, output connection box, and other appropriate views. Assembly drawings may also be utilized.

Plastics

Identification of thermoplastic or thermosetting materials in excess of 2 square inches indicating manufacturer's name, compound designation, and generic name of the material. Indication of any third party certifications, flammability rating and minimum thickness.

Printed wiring boards

Board schematic, parts layout, and foil drawing showing voltage levels for all printed wiring boards that utilize voltages above 60 Volts and all boards incorporating safety control circuits.

Product designation system

A complete nomenclature breakdown of the fuel cell assembly model numbering system.

Product information and instructions

One copy of any advertising literature, operator, user, or maintenance instructions including those appearing on or attached to shipping containers.

Ratings

A complete set of product ratings -- electrical, mechanical and environmental.

System diagrams

One copy of the electrical schematics and gas circuit diagrams with wiring and gas flow diagrams for each unique model. Listing or Recognition status of wiring material, AWG wire sizes, style numbers, voltage rating, and temperature ratings. Also, indication of gas pressure, type of gas, and flow rates at full rated load.

If some of the above information is not available at the time of submittal, it may be possible to proceed with the project. However, there may be delays in the evaluation of those tasks related to the missing materials or information.