全球網站
北美洲
歐洲
美國
丹麥
法國
德國
瑞典
瑞士
英國
拉丁美洲
亞太地區
阿根廷
巴西
墨西哥
澳洲
印度
馬來西亞
紐西蘭
泰國
新加坡
瞭解更多關於產品意識的資訊,也就是全球包括製造商、經銷商、消費者對產品反應出的集體意識。
更多資訊
UL Advantage 是一種革新的安全認證方法,提供更快、更具智慧、更靈活的途徑以享受 UL 認證的好處。
更多資訊
幫助符合安全規範的產品進入全球市場。
更多資訊
為不斷成長的可持續性領域提供廣泛的服務。
更多資訊
將 UL 的工程、安全和效能專業知識應用在對大眾福祉相關的關鍵系統上。
更多資訊
提供全球供應鏈所需的產品測試和評估。
更多資訊
提供培訓、顧問服務及領先思維課程,讓企業獲得競爭優勢。
更多資訊
Share

Industrial Control Panels for use in Hazardous Locations Panel Shop Program

The hazardous locations panel shop program is similar to the UL 508A panel shop program. It allows manufacturers who custom-build and/or mass-produce hazardous locations ICP's to apply the UL Listed Mark at their factories. The program makes it convenient to receive a UL Listing, while allowing the manufacturer to maintain flexibility in panel design.

What coverage is included?

United States and Canadian coverage for:

  • Class I, Division 1 (Explosion-Proof)
  • Class I, Division 1 (Purged/Pressurized Type X)
  • Class I, Division 2 (Purged/Pressurized Type Z)
  • Class I, Division 2 (Nonincendive)

The hazardous locations panel shop requirements are detailed in the UL Report issued at the completion of the project. The basic requirements include that the control panel shall comply with UL 508A and all components relied upon for hazardous locations protection are UL Listed, Recognized, or Classified for the applicable hazardous location.

Although our panel shop program only includes the types of panels shown above, other area classifications (like Class II) and other protection methods can be evaluated on a case-by-case basis.

What is the process for becoming a hazardous locations panel shop?

  • Obtain a UL508A Listing. If you don't currently have this Listing, go to "Become a UL Listed Panel Shop" for more information.
  • If you have a UL508A Listing now, request a HazLoc quote by going to http://my.home1.ul.com/portal/page/portal/PSR/HazLoc and follow the directions posted there (Choose NNNY as product category)
  • Once the quote has been accepted and the preliminary deposit (if required) has been received, a project will be opened and passed to the appropriate UL Engineer.
  • The Engineer will make contact to schedule a training visit at your facility.
  • After the training visit, a UL Report will be issued with all the requirements to build a UL Listed Hazardous Locations Panel.
  • A local UL field representative will conduct an Initial Production Inspection (IPI) on your first panel.
  • After the IPI, the manufacturer can apply the UL Listed Mark.