全球網站
北美洲
歐洲
美國
丹麥
法國
德國
瑞典
瑞士
英國
拉丁美洲
亞太地區
阿根廷
巴西
墨西哥
澳洲
印度
馬來西亞
紐西蘭
泰國
新加坡
瞭解更多關於產品意識的資訊,也就是全球包括製造商、經銷商、消費者對產品反應出的集體意識。
更多資訊
UL Advantage 是一種革新的安全認證方法,提供更快、更具智慧、更靈活的途徑以享受 UL 認證的好處。
更多資訊
幫助符合安全規範的產品進入全球市場。
更多資訊
為不斷成長的可持續性領域提供廣泛的服務。
更多資訊
將 UL 的工程、安全和效能專業知識應用在對大眾福祉相關的關鍵系統上。
更多資訊
提供全球供應鏈所需的產品測試和評估。
更多資訊
提供培訓、顧問服務及領先思維課程,讓企業獲得競爭優勢。
更多資訊
Share

Florida requirements for exterior building products

On October 1, 2003, the state of Florida enacted changes to their product approval system for exterior building products, affecting these products: panel walls, exterior doors, roofing products, skylights, windows, shutters and structural components.

Products used in Florida must be approved by the Florida Building Commission. The process basically consists of two steps:

  • Demonstration of compliance with the Florida Building Code and establishment of a quality assurance program for the product
  • Submittal, by the manufacturer, to the Florida Building Commission for product approval when testing is completed and quality assurance is established. Information regarding the submittal process can be found at www.floridabuilding.org.

There are four ways to demonstrate compliance with the Florida Building Code:

  • A test report from an approved laboratory
  • A certification mark from an approved entity such as UL
  • An evaluation report from an approved evaluation entity
  • An evaluation report from a Florida-licensed P.E. or R.A.

UL provides services to achieve compliance by any of the four methods shown above. However, you can simplify the entire approval process by using UL's certification program that encompasses the testing requirements and the quality assurance requirement that the state of Florida has established.

What are the test requirements for doors and windows?

The Florida Building Code requirements for doors and windows are described in Test Application Standard (TAS) 201, 202 and 203. These Test Application Standards can be found at www.floridabuilding.org. Essentially, four tests are required:

  • Static pressure test conducted in accordance with ASTM E330
  • Cyclic pressure and missile impact tests, conducted in accordance with ASTM E1886 and E1996, are required for high-velocity regions defined by the Florida Building Code as Broward and Dade Counties
  • Air infiltration test conducted in accordance with ASTM E283, related to energy efficiency.

Where can I conduct the tests and obtain UL certification?

UL has partnered with Architectural Testing Inc. (ATI) to fulfill your testing and certification needs. UL will establish certifications based on test data developed by manufacturers at ATI facilities located in York, Pa., and Minneapolis, Minn. The ATI laboratories have been approved by the Florida Building Commission. UL can also witness tests at any facility that is approved by the Florida Building Commission.