全球
北美洲
欧洲
美国
丹麦
法国
德国
瑞典
瑞士
英国
拉丁美洲
亚太地区
阿根廷
巴西
墨西哥
澳大利亚
印度
马来西亚
中国台湾
新西兰
泰国
中国香港
新加坡
深入了解产品意识,也就是全球客户对产品反映出的集体意识,包括生产者和消费者、销售方和购买方。
更多详情
UL Advantage 是进行安全认证的革命性方法,让您能以更快、更智能、更灵活的方式从 UL 认证中获益。
更多详情
将安全、合规的产品推向全球市场。
更多详情
在日益兴起的可持续性业务领域提供多种服务
更多详情
将 UL 在工程、安全和性能方面的专业技术运用于和我们的福祉息息相关的关键系统。
更多详情
按照全球供应链的要求提供产品测试和评估。
更多详情
提供培训和咨询服务以及领先思维课程,让您的企业抢尽竞争先机。
更多详情
Share

Stage 2 DBPR

The Environmental Protection Agency's Stage 2 Disinfectants and Disinfection Byproducts Rule (Stage 2 DBPR) is designed to help reduce the levels of TTHM and HAA5 in distribution systems. The rule affects community water systems (CWSs) and nontransient noncommunity water systems (NTNCWSs) that add a primary or residual disinfectant other than ultraviolet light, or deliver water that has been treated with a primary or residual disinfectant other than ultraviolet light.

Some affected systems are subject to an initial distribution system evaluation (IDSE), which is used to determine Stage 2 monitoring locations. IDSEs are required by all affected CWSs and NTNCWSs that serve at least 10,000 people.

All systems affected by the Stage 2 DBPR are required to submit Stage 2 compliance monitoring plans. These plans must include recommendations on a compliance monitoring schedule and sampling locations.

Your Stage 2 DBPR compliance partner

UL offers the services and expertise to help you comply with Stage 2, including determining your system's compliance schedule and IDSE requirements.

We take pride in both our technical expertise to analyze for disinfection by-products and our in-depth understanding of Stage 2's complex requirements.

This knowledge allows us to serve as a resource for our clients as they develop and implement their monitoring schedules. It also provides our clients and regulatory agencies with confidence that the data we generate will meet Stage 2's compliance requirements.

Results generated by our laboratory are automatically uploaded to the EPA's LT2/Stage 2 Data Collection & Tracking System (DCTS) as required by the rule. Once the results have been posted, they are available for your system to approve.

We look forward to assisting you in complying with Stage 2 DBPR.

Additional resources

For more information on the Stage 2 rule: